Heritage Landing Culvert

Heritage Landing Drive

Completed
Map Pin

District 2

Roads & Bridges

Roads & Bridges

Heritage Landing Drive Culvert Repair

The City is taking the following steps to repair what initially appeared to be a sinkhole on Heritage Landing Drive. It was later determined to be a collapsed storm drain beneath the road:

Project Highlights

  • Installing New Piping: We are using a "trench-less" boring method to install a high-capacity 42-inch pipe toward the river without disturbing the entire surface.
  • System Upgrade: We are connecting the neighborhood's current drainage into this new, stronger system and closing off the old, damaged pipe.
  • Road Restoration: Once the new pipes and manholes are in place, we will fill the collapsed area with stable material and repair the damage to the road.

Project Timeline

  1. Planning
  2. Preparing
  3. In Progress
  4. Completed

Expected Completion: April 15, 2026

The Heritage Landing Drive Culvert Repair Project has been completed.

Project Budget

Budget: $1,169,900

Contingency: $121,000

The budget reflects the complexity and future-proofing our infrastructure based on the three distinct aspects of the project: upgrading the drainage system, stabilizing and filling in the collapsed area, and repairing the road. The expected project budget is $1,169,900 with a contingency of $121,000 in case other issues or complications arise as work progresses.

Latest Project Update

Heritage Landing Road is officially open to traffic following an intensive restoration effort. The project addressed a critical subsurface failure affecting an entrance to the Heritage Landing neighborhood.

View More Updates